Statistics |
Total online: 1 Guests: 1 Users: 0 |
|
Main » 2012 » January » 20 » Plan of Attack: Spring, 2012
4:05 PM Plan of Attack: Spring, 2012 |
Now that the major repairs are done, so to speak, I can start strategizing my repairs/restoration.
Priority is based on a) damage to the car, and b) comfort while driving. My goal is to have all this done by June 1st, 2012.
There are 4 main jobs that need to be done:
1. Transmission 2. Power windows 3. Climate Control 4. Rust
In that order.
The transmission needs just some minor tweaks and adjustments.
The power windows are all not working.
The climate control has heat only - on defrost.
The rust is through the floor panels, and at other various sites on the car. I plan on welding steel plates to the undercarriage to fix the floor panels.
|
Views: 721 |
Added by: Steele
| Rating: 0.0/0 |
|
|
|