Thursday, 2024-04-18
Site menu
Statistics

Total online: 1
Guests: 1
Users: 0
Login form
Main » 2012 » January » 20

Now that the major repairs are done, so to speak, I can start strategizing my repairs/restoration.

Priority is based on a) damage to the car, and b) comfort while driving. My goal is to have all this done by June 1st, 2012.

There are 4 main jobs that need to be done:

1. Transmission
2. Power windows
3. Climate Control
4. Rust

In that order.

The transmission needs just some minor tweaks and adjustments.

The power windows are all not working.

The climate control has heat only - on defrost.

The rust is through the floor panels, and at other various sites on the car. I plan on welding steel plates to the undercarriage to fix the floor panels.


Views: 645 | Added by: Steele | Date: 2012-01-20 | Comments (0)

Search
Calendar
«  January 2012  »
SuMoTuWeThFrSa
1234567
891011121314
15161718192021
22232425262728
293031
Entries archive
Site friends
  • Create a free website
  • Online Desktop
  • Free Online Games
  • Video Tutorials
  • All HTML Tags
  • Browser Kits
  • Copyright MyCorp © 2024
    Website builderuCoz